Malcolm Smith's

RAILWAY  ROUTES

The Bodmin and Wadebridge Railway

Part 15 : Keybridge to Wenford drying sheds

Click on the pictures to see an enlargement

 

  Back to Part 14   Merry Meeting to Keybridge
.

  Milestone 11¼.
   1 September 1984     [16/G/12]
.

  Restrained railchairs.
   1 September 1984     [16/G/11]
.

  Looking back.
   27 August 1980     [08/I/34]
.

  Retaining wall just before the crossing at Poley's Bridge.
   27 August 1980     [08/I/35]
.

  Looking back from the crossing at Poley's Bridge.
   2 September 1984     [16/L/10]
.

  Looking south over the crossing.
   27 August 1980     [08/I/32]
.

  Looking north.
   2 September 1984     [16/L/09]
.

  Train warning sign just before the entrance to the driers on the left.
   1 September 1984     [16/F/26]
.

  Where the line reaches the drying sheds.
   27 August 1980     [08/I/33]
.

  Looking back towards the crossing.
   1 September 1984     [16/G/09]
.

  Looking back from further along.
   1 September 1984     [16/F/27]
.

  Looking forward from the same spot.
   1 September 1984     [16/F/28]
.

  Points and lever.
   1 September 1984     [16/F/29]
.

  More pointwork further alomg.
   1 September 1984     [16/F/30]
.

  Former buffer stop.
   2 September 1984     [16/F/28]
.

  LSWR boundary marker.
   1 September 1984     [16/G/08]
.

  Looking back.
   2 September 1984     [16/M/29]
.

  Looking back from near the end of the sheds.
   1 September 1984     [16/F/31]
.

  Points at the north end of the sheds.
   1 September 1984     [16/F/32]
.
  Continue to part 16   Wenford drying sheds to Wenfordbridge

 

All pictures copyright © Malcolm Smith 2001

 
Return to the
top of the page.
Return to the Routes index.