Step 1 : Mark out the area to be dug.    Next

[Previous / Next / Top]
Step 2 : Dig out the top spit and set aside.

[Previous / Next / Top]
Step 3 : Load out the manure for the lower spit.

[Previous / Next / Top]
Step 4 : Spread the manure on the lower spit.

[Previous / Next / Top]
Step 5 : Turn the lower spit over and trample the soil.

[Previous / Next / Top]
Step 6 : Replace the top spit.

[Previous / Next / Top]
Step 7 : Load out the manure.

[Previous / Top]
Step 8 : Spread the manure.

 