Malcolm Smith's Allotment Double Dug Trenches
Back |
Step 1 : Mark out the area to be dug. Next
[Previous / Next / Top]
Step 2 : Dig out the top spit and set aside.
[Previous / Next / Top]
Step 3 : Load out the manure for the lower spit.
[Previous / Next / Top]
Step 4 : Spread the manure on the lower spit.
[Previous / Next / Top]
Step 5 : Turn the lower spit over and trample the soil.
[Previous / Next / Top]
Step 6 : Replace the top spit.
[Previous / Next / Top]
Step 7 : Load out the manure.
[Previous / Top]
Step 8 : Spread the manure.
Return to the top of the page